Ship hold
- +40%
- Per level
- 10
- Levels
- ×5
- At the top level
- $15,000
- Level 1 cost
- $309,920
- Level 10 cost
- $1,047,200
- All levels
Engineering text
Levels
| Level | Cost | Running total |
|---|---|---|
| 1 | $15,000 | $15,000 |
| 2 | $21,000 | $36,000 |
| 3 | $29,400 | $65,400 |
| 4 | $41,160 | $106,560 |
| 5 | $57,620 | $164,180 |
| 6 | $80,670 | $244,850 |
| 7 | $112,940 | $357,790 |
| 8 | $158,120 | $515,910 |
| 9 | $221,370 | $737,280 |
| 10 | $309,920 | $1,047,200 |
| Level | Multiplier | Ship hold (Cargo hold 0) |
|---|---|---|
| 1 | ×1.4 | 28 |
| 2 | ×1.8 | 36 |
| 3 | ×2.2 | 44 |
| 4 | ×2.6 | 52 |
| 5 | ×3 | 60 |
| 6 | ×3.4 | 68 |
| 7 | ×3.8 | 76 |
| 8 | ×4.2 | 84 |
| 9 | ×4.6 | 92 |
| 10 | ×5 | 100 |